CT FoodChain
CT FoodChain is a rare opportunity for food businesses to build enduring success. As a BRAND-NEW B2 FOOD INDUSTRIAL development in the mature Pandan Food Zone with a 64 year lease, it is an investment in the future and the start of a lasting legacy.
|
Facts
Developer |
Chiu Teng Group |
Address |
200 Pandan Loop |
District |
5 |
Tenure |
99 years from 27 Jan 1984 |
Site Area |
6901.10 sqm |
No. of Parking Lots |
Basement : 43 Car, 1 Handicap, 10 Lorry 1 20 footer Lorry Loading/Unloading Bay |
Estimated Date of TOP |
2022 |
Live Load Ramp |
10 KN/m2 |
Driveway Width @ 2nd ~10th Sty |
7.5m |
Refuse Chute & Kitchen Exhaust Duct |
Dedicated |
Description |
Proposed Erection Of A 10-Storey Multi-User General Industrial Development (Food Factory) With 98 Units On Lot 06856L MK05 At 200 Pandan Loop (Clementi Planning Area) |
Storey |
Height |
Loading |
Electrical |
Mezzanine |
1st Storey |
6.825m |
15 KN/m2 |
125 Amp (3 Phase) |
Yes |
2nd & 3rd Storey |
6.825m |
12.5 KN/m2 |
125 Amp (3 Phase) |
Yes |
4th Storey |
6.825m |
12.5 KN/m2 |
125 Amp (3 Phase) |
N.A |
5th - 9th Storey |
5.075m |
10 kN/m2 |
100 Amp (3 Phase) |
N.A |
10th Storey |
7m |
12.5 KN/m2 |
125 Amp (3 Phase) |
N.A |
Type |
No. |
Dimensions (mm) |
Load |
Service Lift |
2 |
2m x 3m |
3 tonnes |
Passenger Lift |
2 |
1.6m x 1.6m |
15 pax |
Specifications
Plumbing and Sanitary
Plumbing & sanitary installation are provided in accordance with statutory requirements.
Waterproofing
Waterproofing provided to all slabs subjected to water penetration, internal wet areas (e.g. toilets and bin centres), slabs above water-sensitive areas (e.g. substations) and areas open to sky where applicable.
Air-Conditioning and Mechanical Ventilation
Natural/Mechanical ventilation shall be provided in compliance with authority requirements to the designated areas.
Exhaust Duct
Dedicated exhaust duct from each unit to roof with cap off for purchaser's connection at high level.
Gas Supply
Supply of gas (LPG) through pipeline network from the centralised cylinder bank to each unit with cap off at unit entrance.
Waste Disposal System
Refuse chute provided in every unit at 2nd storey to 10th storey and 1 (one) designated bin point for each unit on the 1st storey.
Plumbing & sanitary installation are provided in accordance with statutory requirements.
Waterproofing
Waterproofing provided to all slabs subjected to water penetration, internal wet areas (e.g. toilets and bin centres), slabs above water-sensitive areas (e.g. substations) and areas open to sky where applicable.
Air-Conditioning and Mechanical Ventilation
Natural/Mechanical ventilation shall be provided in compliance with authority requirements to the designated areas.
Exhaust Duct
Dedicated exhaust duct from each unit to roof with cap off for purchaser's connection at high level.
Gas Supply
Supply of gas (LPG) through pipeline network from the centralised cylinder bank to each unit with cap off at unit entrance.
Waste Disposal System
Refuse chute provided in every unit at 2nd storey to 10th storey and 1 (one) designated bin point for each unit on the 1st storey.
Unique Selling Proposition
- RAMP UP, HIGH CEILING, WIDE DRIVE WAY (FAST IN FAST OUT)
- SWEET SPOT TENURE BETWEEN Freehold & 30 YEARS Leasehold
- SUPERB ACCESSIBILITY AND LOCATION
- LORRY LOT NOT PART OF STRATA
- CHOICE OF HIGH CEILING
Pricing
Level 5 to 10:
from $1.5x million
Level 2 to 4:
from $2.2x million
Level 1:
from $3.1x million
from $1.5x million
Level 2 to 4:
from $2.2x million
Level 1:
from $3.1x million
|
Josh Wei Associate Division Director 8399 7983 [email protected] ERA Realty Network Pte Ltd Click to Whatsapp me @ 83997983 |